OPEN DIVISION | ||||
---|---|---|---|---|
Class | Time Allowed | To Make | From | Details |
Forging | 70 mins | Double Caulkin | 12" of 1/2 x 1 1/4 | Strikers Allowed |
Draft Bar Shoe | TBA | |||
Individual Shoeing | 70 mins | plain stamped | on foot | |
trailered heel caulk specimen | 12 3/4" of 3/8 x 3/4 | |||
Two Man Shoeing | 70 mins | 3/4 fullered on foot | 12" of 3/8 x 3/4 | toe clip fronts qtr clipped hinds |
square toe specimen | 10.5" of 1/2 x 1 | |||
Speed Class | 20 mins | Pair of fullered fronts | 12" of 3/8 x 3/4 |
Individual shoeing class
Brushing shoe out of 12-3/4 of 3/8-3/4.
Hybrid 4 nail.
Measures 4-3/4 wide 6 from toe to end of lateral trailer 5-1/4 from toe to medial heel
Two man shoeing class
3/4 fullered straight set-down barshoe.
Out of 18” of 1/2-1”.
E7 nail.
Measures 6-1/8 wide – 6-1/2 long – 3-1/2 bar – 2-3/16 wide set down
Double Caulkin
5 1/4″ wide
6 1/2″ heels butted against anvil
Center to outside 6 5/8″
Center to inside 6 1/2″
Between heel checks – 2″
Nail E7
Square Toe Hind
5 3/8 wide
5 5/8 heel butted against anvil
Center of toe to outside heel 6″
Center of toe to inside heel 5 3/4″
Nail LX60