OPEN DIVISION
ClassTime AllowedTo MakeFromDetails
Forging70 minsDouble Caulkin12" of 1/2 x 1 1/4Strikers Allowed
Draft Bar ShoeTBA
Individual Shoeing70 minsplain stampedon foot
trailered heel caulk specimen12 3/4" of 3/8 x 3/4
Two Man Shoeing70 mins3/4 fullered on foot12" of 3/8 x 3/4toe clip fronts
qtr clipped hinds
square toe specimen10.5" of 1/2 x 1
Speed Class20 minsPair of fullered fronts12" of 3/8 x 3/4

Individual shoeing class

Brushing shoe out of 12-3/4 of 3/8-3/4.

Hybrid 4 nail.

Measures 4-3/4 wide 6 from toe to end of lateral trailer 5-1/4 from toe to medial heel


Two man shoeing class

3/4 fullered straight set-down barshoe.
Out of 18” of 1/2-1”.
E7 nail.
Measures 6-1/8 wide – 6-1/2 long – 3-1/2 bar – 2-3/16 wide set down


Double Caulkin

5 1/4″ wide
6 1/2″ heels butted against anvil
Center to outside 6 5/8″
Center to inside 6 1/2″
Between heel checks – 2″
Nail E7


Square Toe Hind

5 3/8 wide
5 5/8 heel butted against anvil
Center of toe to outside heel 6″
Center of toe to inside heel 5 3/4″
Nail LX60